1、

Research and Analysis Test of Water Balance in Hejin Power Plant

河津电厂水平衡试验分析研究

互联网摘选

2、

Software Design for Optimal Water Balance in Fossil-fired Power Station

火电厂水平衡最优化软件设计

互联网摘选

3、

PH value had also certain effect on the extensibility, and the peaking water binding power appeared at pH 8.0;

pH值对其膨胀性也有一定影响,持水力出现高峰在pH8.0;

互联网摘选

4、

Analysis of Underwater Blasting in Water Resources and Electric Power Constructions

评水利电力建设中的水下爆破

互联网摘选

5、

Analysis the Frugal Power Control Technology of the Fan Blower and Water Pump

风机水泵节能控制技术分析

互联网摘选

6、

The Application of New Far Range Water Soot Blower in Thermal Power Plants

新型远射程水吹灰器在火电厂应用的可行性

互联网摘选

7、

Advances in radioactive wastes management and radiation protection at nuclear power plants with boiling water reactors

沸水堆核电站放射性废物管理与辐射防护的进展

互联网摘选

8、
9、

The Effect of Low Viscosity Coal Water Slurry on Power Station Boiler and Slurry Making Technique Study

低粘度水煤浆对电站锅炉燃烧的影响及制浆技术的研究

互联网摘选

10、

There are hydrogen-powered cars which are called hybrids because they use two power sources-water and gasoline.

有种氢动力车叫混合氢动力车因为他们同时使用两种动力来源 - 水和汽油.

互联网摘选

11、

By power-generating technology of digestive gas fron the waste water sludge, the methane gas produced in the process of the sludge anaerobic fermentation is used as fuel for the generators.

污水污泥消化气发电技术是将污水污泥经厌氧发酵消化后,利用所产生的甲烷气气体作燃料供发电机使用;

互联网摘选

12、

A probe on Water Pressure Test of Boiler Proper for 600 MW Fossil-fired Power Plant

600MW火力发电厂锅炉本体水压试验探讨

互联网摘选

13、

Department of the Interior agency, is the Nation's largest wholesale water supplier and the second largest producer of hydroelectric power in the17 Western states in which it operates.

垦务局隶属于美国内务部,是美国最大的水资源供应和美国西部17州的第二大水力发电机构。

互联网摘选

14、

Using virtual reality technology, a three dimensions visual model of 420 t/ h boiler's main body and power equipments of steam and water system was built, displaying the space relationship of each equipment, seeking a method to realize a low cost desktop VR system.

以420t/h锅炉为建模对象,利用虚拟现实技术制作锅炉本体及汽水系统主要热力设备的三维可视化模型,展示本体中各设备的空间位置关系,寻求一个实现低成本桌面式虚拟现实系统的方法。

互联网摘选

15、

The Optimization Principle and Practice of Thermal/ Nuclear Power Station's Cooling Water Hydraulic Arrangement in Coastal Area

沿海水域火/核电厂冷却水水工布置的优化原则和实践

互联网摘选

16、

Application and Discussion of Charging Pump Decontamination for Pressurized Water Reactor Nuclear Power Station

压水堆核电站上充泵的去污实践及其理论探讨

互联网摘选

17、

The water consumption between wet and-dry FGD processes for-fired power plant is compared based massenergy conservation.

针对燃煤电站比较了钙基湿法或半干法尾部烟气脱硫工艺方案的耗水量.

互联网摘选

18、

In order to reduce the erosion of water-wall, large furnace sectional area should be selected by boiler works, and the power plant should select the coal caloricity close to the designed for use.

对于循环流化床锅炉,炉膛截面积选择的大小影响炉内循环物料的速度,即水冷壁的磨损速度,燃料的发热量影响炉内循环物料的浓度。

互联网摘选

19、

The root number of Dali 52 was the least among tested varieties, plant growing power was weak though its water loss rate was slow.

小偃6号根条数多、供水能力强。大荔52根数最少,失水速度慢,但水分供给能力有限,生长势弱。

互联网摘选

20、

North China University of Water Resources and Electric Power in Zhengzhou, Henan province, has halved the holiday to four days. It will start winter vacation a week earlier than scheduled instead.

位于河南省郑州市的华北水利水电大学决定国庆假期放假4天,寒假放假时间提前7天。

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈